The problem of storing snow removed from city streets is a complex engineering, environmental, and logistics task. It arises where the volume of snow exceeds its immediate melting or utilization capacity. The evolution of approaches to snow "cemeteries" reflects the development of urbanism, technology, and environmental awareness.
Historically, snow was shoveled into piles (drifts) on the sides of roads, in courtyards, and on vacant lots. However, with the growth of cities and transportation, this snow no longer remained clean. It turns into a technogenic mixture containing:
Deicing agents (sodium, calcium, magnesium chlorides)
Heavy metals (lead, cadmium, zinc) from tire and brake pad wear
Oil products, technical fluids
Domestic waste, sand
When it melts in the spring, all these pollutants concentrate in the soil and groundwater, and through stormwater drainage — into water bodies. This leads to soil salinization, the death of vegetation, and contamination of drinking water sources. Therefore, the uncontrolled storage of snow on lawns or within city limits is now legally prohibited in many countries.
Modern snow storage sites are not just pieces of land, but engineered structures designed with environmental standards in mind. Their location and design are regulated by Sanitary Norms and construction standards (in Russia — SP 32.13330.2018, analogs exist in other countries). Key principles:
Isolation from the ground: The site must have a waterproof covering (asphalt concrete, polymer membrane) and embankments for collecting meltwater.
System for collecting and cleaning meltwater: Trenches or wells are arranged around or in the center of the site, from which water is drained through pipes to local treatment facilities (LOF). Treatment usually includes sedimentation, filtration, neutralization of reagents.
Distance from residential construction and water bodies (usually not less than 500-1000 meters).
Interesting fact: For example, in Moscow, large snow melting points operate, and permanent snow storage sites are used rarely. However, where they exist (for example, in Zelenograd), they are concrete platforms with a system for draining runoff to treatment facilities.
To minimize storage areas and accelerate the process, active utilization technologies are being developed:
Stationary snow melting plants (SPP): Represented by shafts or reservoirs where snow is unloaded by dump trucks. Inside, it melts due to:
Heat from urban utilities (hot water from heating networks, which is the most economical).
Electric or gas heaters.
Hot air from operating engines.
Meltwater after multi-stage purification (sand separators, oil separators, sorption filters) is discharged into stormwater drainage. Modern SPP can process up to 500-1000 cubic meters of snow per hour.
Mobile snow melting units: Small units on truck chassis that can be quickly deployed in problem areas. Their productivity is lower (30-150 cubic meters per hour), but they are flexible in application and do not require the construction of capital facilities.
Snow channels (snow drainage collectors): An underground system used in some cities in Japan (Sapporo) and Canada (Montreal). Snow is dropped into special receiving pits on streets, from where it is washed away by a strong stream of hot water through large-diameter pipes directly into water bodies or treatment facilities. This eliminates the need for trucks for removal.
Helsinki, Finland: Use a system of underground storage tanks-snow melting plants, where snow is shoveled from the streets. They are located under parking lots or lawns. Snow melts due to the natural heat of the ground, water is filtered and goes into the soil, which is possible due to relatively clean snow (mainly use gravel instead of chemical reagents).
Toronto, Canada: Use a network of snow storage sites on the outskirts of the city with mandatory stormwater treatment systems. Interestingly, there is a "snow cannon" technology — a special device that breaks up snow piles to accelerate melting.
St. Petersburg, Russia: Has one of the most powerful snow melting systems in the world. The design capacity of SPP is over 50 thousand cubic meters of snow per day. Heat from the heat and power plants of JSC "TEK SPb" (thermal power plants) is actively used for water heating.
Key challenges:
High cost: The construction and operation of SPP or equipped storage sites require huge budgetary expenditures.
Energy intensity: Melting snow is an energy-intensive process.
Searching for sites: Finding a place for a snow melting plant or a dump that meets all standards is extremely difficult in densely populated megacities.
The future is likely to be for combined solutions:
Use of renewable energy sources (solar collectors, heat pumps) for snow melting.
Preliminary cleaning of snow at the collection site (for example, separation of waste and sand).
Development of environmentally friendly deicing materials that will not contaminate the snow cover, which will simplify its utilization.
Modern snow storage is not just about removing it "as far as possible." It is an essential part of the city's environmental infrastructure, requiring a scientific approach, engineering solutions, and significant investments. The transition from spontaneous heaps to equipped snow melting complexes reflects the general trend towards smart and responsible urban management, where even temporary seasonal problems are solved with a view to long-term environmental and public health consequences.
© libmonster.com
New publications: |
Popular with readers: |
News from other countries: |
![]() |
Editorial Contacts |
About · News · For Advertisers |
U.S. Digital Library ® All rights reserved.
2014-2026, LIBMONSTER.COM is a part of Libmonster, international library network (open map) Keeping the heritage of the United States of America |
US-Great Britain
Sweden
Serbia
Russia
Belarus
Ukraine
Kazakhstan
Moldova
Tajikistan
Estonia
Russia-2
Belarus-2